Cost-Effective School HVAC Upgrades: Saskatoon Public Schools
Saskatoon Public Schools chose field-installed APR Controls on standard condensing units over variable-speed systems, cutting upfront cost across dozens of schools while improving dehumidification and equipment life.

The Challenge
The district needed to replace aging condensing units across 48 elementary and 10 secondary schools while staying on budget. Engineers first looked at variable-speed compressor solutions, but were concerned about the cost and complexity of digital scroll technology, as well as past reliability issues with hot gas bypass systems.
The Solution
Trane Saskatoon recommended the Rawal APR Control as a more affordable and efficient alternative. It provides variable capacity control with no additional electronics, and installs entirely within the condensing-unit section with no extra piping required.
“This is not hot gas bypass. We can unload the compressor in a different way. Everything is contained to the unit and it's a very contractor-friendly solution.”
Alex Barnes · Associate Account Manager, Trane Saskatoon
The Results
The project moved ahead with significant upfront savings versus variable speed, and:
- Installed seamlessly using contractors experienced from prior school jobs
- Enabled dynamic capacity modulation for efficient dehumidification
- Reduced equipment wear and extended service life
- Set up anticipated, ongoing energy savings across the district
Have a similar challenge?
Ending unit-ventilator short cycling in schools? Tell us the equipment and we size the retrofit, on us, with a one-business-day response.