Are there additional materials needed to install the control?
When installing the APR Control, you will need the following additional materials:
· “T’s” for each of the APR Control connections to the system suction line, liquid line, discharge line and the external equalizer line where necessary.
· Isolation Ball Valves are required for each connection.
· There will be a small amount of piping needed
· Insulation for the sensing bulbs only
· Mounting hardware
For more comprehensive details of what is needed, please contact us or see our installation video.