Providing continuous capacity modulation for HVAC/R DX systems since 1993 · 100,000+ valves installed in the field

Install

How to Install the APR Control

The full three-connection install on a DX system, start to finish.

Click to play. Straight from the Rawal Devices YouTube channel.

In this video

A complete installation walk-through. The APR Control installs in the condenser section with three refrigerant connections and no external piping on split systems. This covers the connections and the process from start to finish, followed by setpoint adjustment.

Key takeaways

  • Installs in the condenser section of the unit
  • Three refrigerant connections; no external piping on split systems
  • The start-to-finish install process
  • Setpoint adjustment follows — see How to Adjust the APR Control

Want a walk-through for your equipment?

Book time with a Rawal Devices Engineer, or catch the free live pre-installation webinar three mornings a week.

[email protected] · 800‑727‑6447 · rawal.com